Select locations along I-88, including from IL 56 to east of IL 59 and between the Aurora Toll Plaza and IL 59, required construction engineering services on an as-needed basis over a 2-year duration for roadway rehabilitation. Specific work items included drainage improvements, crack filling, concrete pavement, bridge deck sealer, lighting, landscaping, signage structure repair, pavement markings, and guardrail installation.
Sine Qua Non | Absolutely Essential