TRANSIT

CTA 95th St. Terminal Improvement

This $280 million design-build project for the CTA Red Line involved construction of a new terminal on the south side of 95th St. and extensive rehabilitation of the existing terminal on the north side of 95th St. Work included upgraded bus bridges, a new pedestrian bridge over 95th St., an enhanced walkway/loading platform at track level, and accessible elevators and escalators connecting all station levels.